Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
481183 | European Journal of Operational Research | 2009 | 8 Pages |
Abstract
The multi-criteria scheduling problem is one of the main research subjects in the field of multiple objectives programming. Several procedures have been developed to deal with this type of problem where some conflicting criteria have to be optimized simultaneously. The aim of our paper is to propose an aggregation procedure that integrates three different criteria to find the best sequence in a flow shop production environment. The compromise programming model and the concept of satisfaction functions will be utilized to integrate explicitly the manager’s preferences according to the deviations between the achievement and the aspiration levels of the following criteria: Makespan, total flow time and total tardiness.
Related Topics
Physical Sciences and Engineering
Computer Science
Computer Science (General)
Authors
Mohamed Anis Allouche, Belaïd Aouni, Jean-Marc Martel, Taïcir Loukil, Abdelwaheb Rebaï,