Article ID Journal Published Year Pages File Type
481562 European Journal of Operational Research 2009 13 Pages PDF
Abstract

Assembly line balancing generally requires a set of acceptable solutions to the several conflicting objectives. In this study, a binary fuzzy goal programming approach is applied to assembly line balancing. Models for balancing straight and U-shaped assembly lines with fuzzy goals (the number of workstations and cycle time goals) are proposed. The binary fuzzy goal programming models are solved using the methodology introduced by Chang [Chang, C.T., 2007. Binary fuzzy goal programming. European Journal of Operational Research 180 (1), 29–37]. An illustrative example is presented to demonstrate the validity of the proposed models and to compare the performance of straight and U-shaped line configurations.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , ,