Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
483130 | European Journal of Operational Research | 2006 | 16 Pages |
In this paper, a δ-shock maintenance model for a deteriorating system is studied. Assume that shocks arrive according to a renewal process, the interarrival time of shocks has a Weibull distribution or gamma distribution. Whenever an interarrival time of shocks is less than a threshold, the system fails. Assume further the system is deteriorating so that the successive threshold values are geometrically nondecreasing, and the consecutive repair times after failure form an increasing geometric process. A replacement policy N is adopted by which the system will be replaced by an identical new one at the time following the Nth failure. Then the long-run average cost per unit time is evaluated. Afterwards, an optimal policy N* for minimizing the long-run average cost per unit time could be determined numerically.