Article ID Journal Published Year Pages File Type
483143 European Journal of Operational Research 2007 16 Pages PDF
Abstract

PRECON S.A. is a manufacturing company devoted to produce prefabricated concrete parts for several industries as railway transportation and agricultural industries. Recently, PRECON S.A. signed a contract with RENFE, the Spanish National Railway Company, to manufacture pre-stressed concrete sleepers for the sidings of the new railways of the high speed train (AVE). The scheduling problem associated with the manufacturing process of the sleepers is very complex, since this involves several constraints and objectives. These constraints are related to production capacity, the quantity of available moulds, demand satisfaction and other operational constraints. The two main objectives are related to the way to maximize the utilization of manufacturing resources and minimize mould movements. We developed a deterministic crowding genetic algorithm for this multiobjective problem. The algorithm has proved to be a powerful and flexible tool to solve large-scale instances of this real and complex scheduling problem.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , ,