Article ID Journal Published Year Pages File Type
483232 European Journal of Operational Research 2007 8 Pages PDF
Abstract

This note investigates two-machine flow shop scheduling with transportation constraints to minimize makespan. Recently, Soukhal et al. [A. Soukhal, A. Oulamara, P. Martineau, Complexity of flow shop scheduling problems with transportation constraints, European Journal of Operational Research 161 (2005) 32–41] proved that this problem is strongly NP-hard when the capacity of the truck is limited to two or three parts. The considered problem with blocking constraints is also proved to be strongly NP-hard by Soukhal et al. Unfortunately, their proofs contain mistakes. We point out their proofs’ invalidity and then show that, when the capacity of the truck is limited to two parts, the problem is binary NP-hard, and when the capacity of the truck is limited to three parts the problem is strongly NP-hard even if the jobs have a common processing time on machine one and all jobs have the same transportation time. We show also that the last result can be generalized to any fixed c (c ⩾ 3) parts.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , , ,