Article ID Journal Published Year Pages File Type
483285 European Journal of Operational Research 2007 31 Pages PDF
Abstract

The coordination of just-in-time production and transportation in a network of partially independent facilities to guarantee timely delivery to distributed customers is one of the most challenging aspect of supply chain management. From a theoretical perspective, the timely production/distribution can be viewed as a hybrid combination of planning, scheduling and routing problems, each notoriously affected by nearly prohibitive combinatorial complexity. From a practical viewpoint, the problem calls for a trade-off between risks and profits. This paper focuses on the ready-mixed concrete delivery: in addition to the mentioned complexity, strict time-constraints forbid both earliness and lateness of the supply. After developing a detailed model of the considered problem, we propose a novel meta-heuristic approach based on a hybrid genetic algorithm combined with constructive heuristics. A detailed case study derived from industrial data is used to illustrate the potential of the proposed approach.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , , ,