Article ID Journal Published Year Pages File Type
483298 European Journal of Operational Research 2006 18 Pages PDF
Abstract

This paper deals with pre-emptive open-shop scheduling problems with time-windows. Network flow procedures to check feasibility and a max-flow parametrical algorithm to minimize the makespan are introduced. Also, computational complexities are evaluated for these feasibility and optimization algorithms. The proposed method is a strongly polynomial algorithm to minimize the makespan of the pre-emptive open-shop scheduling problems with time-windows strictly respected. Finally, the applications of the proposed algorithms are illustrated with numerical examples.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , ,