Article ID Journal Published Year Pages File Type
487862 Procedia Computer Science 2014 10 Pages PDF
Abstract

Large engineering programs like sociotechnical infrastructure constructions of airports, plant constructions, or the development of radically innovative, high-tech industrial products such as electric vehicles or aircraft are affected by a number of serious risks, and subsequently commonly suffer from large cost overruns. Significant problems in program execution can be traced back to practices performed, or more frequently not performed, in the so-called “fuzzy front end” of the program. The lack of sufficient and effective efforts in the early stages of a program can result in unstable, unclear and incomplete requirements, unclear roles and responsibilities within the program organization, insufficient planning, and unproductive tensions between program management and systems engineering.This study intends to clarify the importance of up-front planning to improve program performance, to propose a model for the front-end of large-scale engineering programs based on a review of existing, suitable models in literature and to better understand the complexity drivers that are impeding reliable planning and common planning mistakes made in large-scale engineering programs.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)