Article ID Journal Published Year Pages File Type
4911295 Automation in Construction 2017 12 Pages PDF
Abstract
As an example, this modeling approach is simulated for the construction of concrete stairs and elevators core of a characteristic high-rise structure. The concrete works were considered to be carried out using climbing formwork. Three different scenarios are shown in this paper. The first scenario is simulated with deterministic durations and validates the developed Petri net. The second scenario uses stochastic process durations to show the robustness of the construction process. Finally, disturbances and delays are integrated and an automated rescheduling based on prioritized alternative paths is used.
Related Topics
Physical Sciences and Engineering Engineering Civil and Structural Engineering
Authors
, , , , , , , , ,