Article ID Journal Published Year Pages File Type
4916406 Applied Energy 2017 13 Pages PDF
Abstract
It is found that the primary non-renewable exergy embodied in electricity produced by the analyzed WtE is non-negligible for both the construction (127.1 toe) and the operation phases (11.6 toe/y). Nonetheless, the plant is able to produce a net amount of electricity that pays back such primary non-renewable resources requirements about a hundred times. Finally, the joint application of Exergy Analysis and ELCA lead to improve the overall thermodynamic performances of the WtE system, increasing its exergy efficiency by 1%, and reducing the non-renewable exergy embodied in electricity production by 7938 toe.
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , ,