Article ID Journal Published Year Pages File Type
491698 Simulation Modelling Practice and Theory 2016 17 Pages PDF
Abstract

The fast-paced growth in containerized trade market sparks the need for efficient operations at seaport container terminals. One major determinant of terminal efficiency is the productivity of Quay Cranes (QC) resulting from QC scheduling. This paper focuses on the QC Scheduling Problem (QCSP). The objective is to minimize vessel handling time while considering the entire container handling process involving both seaside operations and container transfer operations, taking place between the quay and the stacking yard. A stochastic mixed integer programming model is proposed, and a simulation-based Genetic Algorithm (GA) is applied to construct QC schedules that account for the dynamics and the uncertainty inherent to container handling process. Computational experiment shows satisfactory results of the proposed algorithm and stresses the importance of simulation to obtain more reliable estimates of QC schedule performance.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , ,