Article ID Journal Published Year Pages File Type
495554 Applied Soft Computing 2014 9 Pages PDF
Abstract

•We presented an improved cuckoo search algorithm for real-industrial hybrid flow shop scheduling problems.•To the best of our knowledge this is the first attempt to apply the cuckoo search algorithm to a real-industrial scheduling problem.•Computational experiments are conducted to validate the proposed algorithm.•Computational results show that the improved cuckoo search algorithm outperforms with many other metaheuristics in the literature.

The multistage hybrid flow shop (HFS) scheduling problems are considered in this paper. Hybrid flowshop scheduling problems were proved to be NP-hard. A recently developed cuckoo search (CS) metaheuristic algorithm is presented in this paper to minimize the makespan for the HFS scheduling problems. A constructive heuristic called NEH heuristic is incorporated with the initial solutions to obtain the optimal or near optimal solutions rapidly in the improved cuckoo search (ICS) algorithm. The proposed algorithm is validated with the data from a leading furniture manufacturing company. Computational results show that the ICS algorithm outperforms many other metaheuristics.

Graphical abstractFigure optionsDownload full-size imageDownload as PowerPoint slide

Related Topics
Physical Sciences and Engineering Computer Science Computer Science Applications
Authors
, , ,