Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
4968332 | Sustainable Energy, Grids and Networks | 2017 | 18 Pages |
Abstract
The analysis results show that the planned generation capacities are adequate to cover future electricity demand in the Baltic States in 2020 and 2030. Under the current electricity grid planning, power distribution in some local areas is limited in the future scenarios. Additional grid investments are necessary to keep high security level of power supply in 2020/30.
Keywords
Related Topics
Physical Sciences and Engineering
Computer Science
Computer Science Applications
Authors
E. Bompard, E. Carpaneto, T. Huang, R.J. Pi, G. Fulli, A. Purvins, A. Mutule,