Article ID Journal Published Year Pages File Type
4968332 Sustainable Energy, Grids and Networks 2017 18 Pages PDF
Abstract
The analysis results show that the planned generation capacities are adequate to cover future electricity demand in the Baltic States in 2020 and 2030. Under the current electricity grid planning, power distribution in some local areas is limited in the future scenarios. Additional grid investments are necessary to keep high security level of power supply in 2020/30.
Related Topics
Physical Sciences and Engineering Computer Science Computer Science Applications
Authors
, , , , , , ,