Article ID Journal Published Year Pages File Type
4968344 Sustainable Energy, Grids and Networks 2017 29 Pages PDF
Abstract
It is expected from a microgrid to supply its local demand independently; however, the load and generation intermittency may lead to overloading of a microgrid temporarily. It is suggested in the literature that this problem can be mitigated by importing the required power from one/more neighboring microgrid(s), after their temporary coupling. This paper focuses on the transition stage of forming a system of coupled microgrids. A suitable and practically applicable strategy is developed in this paper, which facilitates the appropriate connection of the microgrids. The performance of the developed strategy is evaluated by time-domain simulation studies in PSCAD/EMTDC.
Keywords
Related Topics
Physical Sciences and Engineering Computer Science Computer Science Applications
Authors
, ,