Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
509567 | Computers in Industry | 2007 | 12 Pages |
Abstract
Production scheduling in mixed batch/continuous plants, due to their hybrid nature, can become very complex. The main contribution of this paper is the presentation of a novel approach based on the integration of the Timed arc hybrid Petri net (TAHPN) and a genetic algorithm (GA) as a suitable tool for scheduling of hybrid systems. The major benefit of this approach is a significant reduction in complexity during problem formulation. The proposed method is explained through a sugar mill case study.
Keywords
Related Topics
Physical Sciences and Engineering
Computer Science
Computer Science Applications
Authors
S.A. Sadrieh, M. Ghaeli, P.A. Bahri, P.L. Lee,