Article ID Journal Published Year Pages File Type
5127519 Computers & Industrial Engineering 2017 4 Pages PDF
Abstract

•The errors about limited waiting time in the original paper are analyzed.•A correct mixed-integer linear programming model is proposed to describe the problem.•The confusing blocking time is discussed.•Numerical experiments are conducted to illustrate the necessity of correction.

The two-stage flow shop scheduling problem with a batch processing machine and limited waiting time was studied in the paper entitled “Two new approaches for a two-stage hybrid flowshop problem with a single batch processing machine under waiting time constraint” [Chung, T.-P., Sun, H., Liao, C.-J., 2016, Computers & Industrial Engineering, 10.1016/j.cie.2016.11.031]. In the original paper, this problem was formulated as a mixed-integer linear programming model. However, this model is not correct and the blocking time is confusing. In this note, a correct mixed-integer linear programming model is proposed and the confusing blocking time is discussed. Numerical experiments are conducted to illustrate the necessity of correction.

Related Topics
Physical Sciences and Engineering Engineering Industrial and Manufacturing Engineering
Authors
, , , ,