Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
568402 | Advances in Engineering Software | 2010 | 9 Pages |
Abstract
In this paper, a multi-product economic production quantity problem with limited warehouse-space is considered in which the orders are delivered discretely in the form of multiple pallets and the shortages are completely backlogged. We show that the model of the problem is a constrained non-linear integer program and propose a genetic algorithm to solve it. Moreover, design of experiments is employed to calibrate the parameters of the algorithm for different problem sizes. At the end, a numerical example is presented to demonstrate the application of the proposed methodology.
Keywords
Related Topics
Physical Sciences and Engineering
Computer Science
Software
Authors
Seyed Hamid Reza Pasandideh, Seyed Taghi Akhavan Niaki, Jalil Aryan Yeganeh,