Article ID Journal Published Year Pages File Type
621889 Chemical Engineering Research and Design 2012 10 Pages PDF
Abstract
► Existing problems and corresponding solutions in supercritical water oxidation (SCWO) are introduced. ► The first SCWO pilot scale plant of China is constructed to treat sewage sludge. ► The detailed system components and evident properties of the plant are described objectively. ► A simple economical comparison with incineration plant is carried out.
Related Topics
Physical Sciences and Engineering Chemical Engineering Filtration and Separation
Authors
, , , , , , ,