Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
647757 | Applied Thermal Engineering | 2011 | 9 Pages |
Abstract
⺠We presented a method of finding the optimal tank size and operating strategies. ⺠This method was illustrated with a new chilled water storage project. ⺠The results show that a 3.5 million gallon tank has the shortest simple payback time.⺠Full storage is selected in summer and storage-priority is selected in winter. ⺠The annual billing cost savings are estimated at $907,231.
Keywords
Related Topics
Physical Sciences and Engineering
Chemical Engineering
Fluid Flow and Transfer Processes
Authors
Zhiqin Zhang, William D. Turner, Qiang Chen, Chen Xu, Song Deng,