Abstract
Power improvement of a combined cycle power plant using inlet air cooling was analyzed in this paper. The corresponding CC capacities in a range of 100-600 MW were examined. The CC performance can be improved by decreasing an inlet air temperature and humidity to 15 °C (ISO) and 100% RH before entering air compressor of a gas turbine (GT). All year ambient temperature in Bangkok is normally higher than 15 °C. This research used a steam absorption chiller (AC) to cool intake air to the desired temperature level and no storage unit was needed. The CC uses a cooling tower (CT) for cooling purpose. In the 400 MW power plant as an example, it could increase the power output of the GT by 9.32% and the CC by 5.8%, while the ST power decreased by 3.42% annually, as some steam was supplied to the AC. In the economical analysis, the payback period (PB) will be in the range of 0.68-0.94 years, internal rate of return (IRR) 29-176%, and net present value (NPV) 116.5-154.63 MUS$. Additionally, sensitivity analysis concerning economic performance and environmental impact of the plants were also studied.
Keywords
Related Topics
Physical Sciences and Engineering
Chemical Engineering
Fluid Flow and Transfer Processes
Authors
S. Boonnasa, P. Namprakai,