Abstract
For smaller unmet load of up to 4% in Scenario 1, Diesel Genset turns out to be the most preferred hybrid option, irrespective of whether the environmental costs were included alongside the net present costs or not. However, for an increased future load of 12.5% in Scenario 2, including the environmental costs makes the hybrid Micro hydro-PV-Diesel-Battery system cost-competitive to the Diesel only option. Considering a 25-year project lifespan, it becomes the most sustainable solution for retrofitting micro hydro facilities in ecologically sensitive locations in order to meet future shortfall in electricity supply, with improved renewable penetration of up to 97.5%.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
W. Apichonnabutr, A. Tiwary,