Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6683444 | Applied Energy | 2016 | 19 Pages |
Abstract
To prove the quality of presented model, the authors calibrated it with the data from Polish power system for different scenarios. Results indicate that the consideration of financial costs and required reserves increase the reliability of the optimization outcomes.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
Michal Wierzbowski, Wojciech Lyzwa, Izabela Musial,