Article ID Journal Published Year Pages File Type
6694335 Applied Energy 2013 8 Pages PDF
Abstract
► A life cycle assessment for the transmission of power in Norway is undertaken. ► Study includes: power lines, cables, transformers and substations installed by 2009. ► The transmission of 1 kW h of electricity in Norway generates 1.3-1.5 g CO2 eq. ► Overhead lines, transformers and SF6 losses cause most infrastructure impacts. ► A sensitivity analysis for different power mixes when modelling losses is performed.
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology