Article ID Journal Published Year Pages File Type
6695961 Automation in Construction 2018 22 Pages PDF
Abstract
The method is extensively tested in the experiment section of this paper. Since each consecutive process is based on the output of preceding steps, each process of the introduced method is tested for its standalone characteristics. In addition, the general manner of applicability is evaluated by means of two exemplary tasks as a concluding proof of the success of the novel method. All experiments show promising results and direct towards automatic indoor progress monitoring.
Related Topics
Physical Sciences and Engineering Engineering Civil and Structural Engineering
Authors
, , ,