Article ID Journal Published Year Pages File Type
6721201 Construction and Building Materials 2015 8 Pages PDF
Abstract
A reduction in rehabilitation costs by about 20% is the main objective of this project while reducing response times in situ and maintaining an equivalent efficiency of the reinforcement. The first part recounts the history of the various stages of the Parisian sewer system construction. It subsequently takes stock of the pathologies, the repair techniques and the investigation methods of these structures. The second part deals with the design of test pieces through numerical calculation while taking into consideration the various parameters applied to each material. The selected model is a vault representing the upper part of an ovoid. The third part is an experimental approach to characterizing materials and in particular the coating/glue/composite interface.
Related Topics
Physical Sciences and Engineering Engineering Civil and Structural Engineering
Authors
, , , ,