Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6746220 | Fusion Engineering and Design | 2015 | 5 Pages |
Abstract
The paper will illustrate the organization, methods and results of the dedicated metrology campaigns have been defined and carried out in the WEST dis/assembly phase. To conclude, the future needs of metrology at CEA/IRFM will be exposed to define the next steps.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
C. Brun, G. Archambeau, L. Blanc, J. Bucalossi, M. Chantant, L. Gargiulo, A. Hermenier, R. Le, A. Pilia,