| Article ID | Journal | Published Year | Pages | File Type |
|---|---|---|---|---|
| 6747462 | Hormign y Acero | 2016 | 11 Pages |
Abstract
The erection of the segments for the cable-stayed bridge required the use of the following pieces of deck construction equipment:
Related Topics
Physical Sciences and Engineering
Engineering
Civil and Structural Engineering
Authors
José Luis Castro Rubal, Jesús de los RÃos de Francisco, JoaquÃn Arroyo Márquez, José Luis Salamanca GarcÃa, José Luis MartÃnez MartÃnez,
