Abstract
Relevant features in the design and construction of the access viaduct from Puerto Real side to Constitución de 1812 Bridge are described in this paper. It is a continuous prestressed concrete structure with a total length of 1.200,75Â m, which extends from the abutment 2 to the connection with the cable stayed spans. Closer area to abutment 2 is a voided slab with standard span of 40Â m, cross section 2Â m deep, and maximum width of 35,85Â m. Span by span construction with falsework on the ground was developed for the total width of the deck. Closer area to cable stayed spans is a 3Â m deep three-cell box cross section with span lengths up to 75Â m. A span by span sequence with arcaded falsework was carried out for cross section's central cell, and cantilevers at both sides were then constructed with a form traveller system.
Related Topics
Physical Sciences and Engineering
Engineering
Civil and Structural Engineering
Authors
Javier Pascual Santos, Diego Pajuelo Gallardo, Antonio Carnerero Ruiz, Francisco de Borja Mendizábal del Arco, Pablo Campos Acebo,