Article ID Journal Published Year Pages File Type
6747490 Hormign y Acero 2016 4 Pages PDF
Abstract
Quality assurance system of the Constitution of 1812 cable-stayed Bridge over the Cádiz Bay has been made by attention to the particular requirements of the work. The best tools have been used to achieve a «0 defects» target via communication and control of the human factor.
Related Topics
Physical Sciences and Engineering Engineering Civil and Structural Engineering
Authors
, ,