Article ID Journal Published Year Pages File Type
6893918 Engineering Science and Technology, an International Journal 2017 12 Pages PDF
Abstract
The various costs such as purchase active power from grid, DG installation, capacitor installation, DG Operation and Maintenance (O&M) are evaluated at two different load scenarios. In addition to that, technical and economical analyses are examined for various combinations of DGs and shunt capacitors. The proposed methodology is successfully demonstrated on 33-bus and 85-bus radial networks and the obtained numerical outcomes validate the suitability, importance and effectiveness to identify locations as well as sizes of DGs and shunt capacitors.
Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , ,