6894873 European Journal of Operational Research 2018 33 Pages PDF
Abstract
We consider the problem of scheduling with renewable speed-up resources. Given m identical machines, n jobs and c different discrete resources, the task is to process each job non-preemptively on one of the machines so as to minimize the makespan. In our problem, a job has its original processing time, which could be reduced by utilizing one of the resources. As resources are different, the amount of the time reduced for each job is different depending on the resource it uses. Once a resource is being used by one job, it cannot be used simultaneously by any other job until this job is finished, hence the scheduler should take into account the job-to-machine assignment together with the resource-to-job assignment. We observe that, the classical unrelated machine scheduling problem is actually a special case of our problem when m=c, i.e., the number of resources equals the number of machines. Extending the techniques for the unrelated machine scheduling, we give a 2-approximation algorithm when both m and c are part of the input. We then consider two special cases for the problem, with either m or c being a constant, and derive PTASes (Polynomial Time Approximation Schemes) respectively. We also establish the relationship between the two parameters m and c, through which we are able to transform the PTAS for the case when m is constant to the case when c is a constant. The relationship between the two parameters reveals the structure within the problem, and may be of independent interest.
Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , ,