| Article ID | Journal | Published Year | Pages | File Type |
|---|---|---|---|---|
| 6895696 | European Journal of Operational Research | 2016 | 30 Pages |
Abstract
In this paper we study the periodic maintenance problem: given a set of m machines and a horizon of T periods, find indefinitely repeating itself maintenance schedule such that at most one machine can be serviced at each period. In addition, all the machines must be serviced at least once for any cycle. In each period the machine i generates a servicing cost bi or an operating cost which depends on the last period in which i was serviced. The operating cost of each machine i in a period equals ai times the number of periods since the last servicing of that machine. The main objective is to find a cyclic maintenance schedule of a periodicity T that minimizes total cost. To solve this problem we propose a new Mixed Integer programming formulation and a new heuristic method based on general Variable neighborhood search called Nested general variable neighborhood search. The performance of this heuristic is shown through an extensive experimentation on a diverse set of problem instances.
Keywords
Related Topics
Physical Sciences and Engineering
Computer Science
Computer Science (General)
Authors
Raca TodosijeviÄ, Rachid Benmansour, Saïd Hanafi, Nenad MladenoviÄ, Abdelhakim Artiba,
