Article ID Journal Published Year Pages File Type
6896522 European Journal of Operational Research 2015 32 Pages PDF
Abstract
We consider the stowage planning problem of a container ship, where the ship visits a series of ports sequentially and containers can only be accessed from the top of the stacks. At some ports, certain containers will be unloaded temporarily and will be loaded back later for various purposes. Such unproductive movements of containers are called shifts, which are both time and money consuming. Literature shows that binary linear programming formulation for such problems is impracticable for real life problems due to the large number of binary variables and constraints. Therefore, we develop a heuristic algorithm which can generate stowage plans with a reasonable number of shifts for such problems. The algorithm, verified by extensive computational experimentations, performs better than the Suspensory Heuristic Procedure (SH algorithm) proposed in Avriel et al. (1998), which, to the best of our knowledge, is one of the leading heuristic algorithms for such stowage planning problem.
Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, ,