Article ID Journal Published Year Pages File Type
6897418 European Journal of Operational Research 2014 11 Pages PDF
Abstract
We establish a flexible capacity strategy model with multiple market periods under demand uncertainty and investment constraints. In the model, a firm makes its capacity decision under a financial budget constraint at the beginning of the planning horizon which embraces n market periods. In each market period, the firm goes through three decision-making stages: the safety production stage, the additional production stage and the optimal sales stage. We formulate the problem and obtain the optimal capacity, the optimal safety production, the optimal additional production and the optimal sales of each market period under different situations. We find that there are two thresholds for the unit capacity cost. When the capacity cost is very low, the optimal capacity is determined by its financial budget; when the capacity cost is very high, the firm keeps its optimal capacity at its safety production level; and when the cost is in between of the two thresholds, the optimal capacity is determined by the capacity cost, the number of market periods and the unit cost of additional production. Further, we explore the endogenous safety production level. We verify the conditions under which the firm has different optimal safety production levels. Finally, we prove that the firm can benefit from the investment only when the designed planning horizon is longer than a threshold. Moreover, we also derive the formulae for the above three thresholds.
Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, ,