Article ID Journal Published Year Pages File Type
6897483 European Journal of Operational Research 2014 10 Pages PDF
Abstract
One of the largest bottlenecks in iron and steel production is the steelmaking-continuous casting (SCC) process, which consists of steel-making, refining and continuous casting. The SCC scheduling is a complex hybrid flowshop (HFS) scheduling problem with the following features: job grouping and precedence constraints, no idle time within the same group of jobs and setup time constraints on the casters. This paper first models the scheduling problem as a mixed-integer programming (MIP) problem with the objective of minimizing the total weighted earliness/tardiness penalties and job waiting. Next, a Lagrangian relaxation (LR) approach relaxing the machine capacity constraints is presented to solve the MIP problem, which decomposes the relaxed problem into two tractable subproblems by separating the continuous variables from the integer ones. Additionally, two methods, i.e., the boundedness detection method and time horizon method, are explored to handle the unboundedness of the decomposed subproblems in iterations. Furthermore, an improved subgradient level algorithm with global convergence is developed to solve the Lagrangian dual (LD) problem. The computational results and comparisons demonstrate that the proposed LR approach outperforms the conventional LR approaches in terms of solution quality, with a significantly shorter running time being observed.
Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , , ,