Article ID Journal Published Year Pages File Type
6897581 European Journal of Operational Research 2014 11 Pages PDF
Abstract
In this paper, an overview is presented of the existing metaheuristic solution procedures to solve the multi-mode resource-constrained-project scheduling problem, in which multiple execution modes are available for each of the activities of the project. A fair comparison is made between the different metaheuristic algorithms on the existing benchmark datasets and on a newly generated dataset. Computational results are provided and recommendations for future research are formulated.
Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, ,