Article ID Journal Published Year Pages File Type
6901071 Procedia Computer Science 2017 7 Pages PDF
Abstract
The main problem of the electrical operational systems in Indonesia is how to maintain the continuity of effective and efficient services to the customers and meet the supply and demand for electrical power, particularly a lot of islands area in Indonesia are far distant from the power generation sources. Based on these problems, it is cleared that an electricity system is required for long-term solutions so that it can enhance the role of new and renewable energy, improve the electricity reliability and reduce the energy costs. Efficiency and effectiveness is expected to increase the sustainable electricity supply for remote and isolated area in Madura island by utilizing the available resources like potential solar energy as a new and renewable energy. The development of photovoltaic power plant is a fast and independent solution because the access and infrastructure in Madura island doesn't support yet for the conventional electrical facilities. System dynamics method is used to analyse the system by creating a scenario model to identify any factors and variables which affect the system. As the result of the scenario model, total demand for electricity supply in the 58 remote villages in Pamekasan is 24,935 MW, which cost Rp 632.812.500.000,- for the photovoltaic power plant investment. To complete the analysis feasibility in order to meet the fulfilment, it is also considered economics aspect with Payback Period, which is need 25 years to return the investment in optimistic scenario.
Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, ,