Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6904687 | Applied Soft Computing | 2016 | 12 Pages |
Abstract
- Flexible flow shop scheduling problem with robotic transportation is presented.
- Minimization of maximum completion time of all parts is considered as objective function.
- A mixed integer linear programming model is proposed for the problem.
- Two meta-heuristic algorithm, GA and ACO, is presented.
Related Topics
Physical Sciences and Engineering
Computer Science
Computer Science Applications
Authors
Seyedeh Sarah Zabihzadeh, Javad Rezaeian,