Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6918667 | Computer Methods in Applied Mechanics and Engineering | 2012 | 17 Pages |
Abstract
⺠The reliability of fatigue prone structures is improved by maintenance scheduling. ⺠Fatigue cracks are modeled by means of cohesive elements. ⺠Fatigue crack growth and the outcome of inspections are affected by uncertainties. ⺠The optimal maintenance scheme is determined using reliability based optimization. ⺠The optimum is a trade off between the inspection, repair and failure costs.
Related Topics
Physical Sciences and Engineering
Computer Science
Computer Science Applications
Authors
P. Beaurepaire, M.A. Valdebenito, G.I. Schuëller, H.A. Jensen,