Article ID Journal Published Year Pages File Type
6918667 Computer Methods in Applied Mechanics and Engineering 2012 17 Pages PDF
Abstract
► The reliability of fatigue prone structures is improved by maintenance scheduling. ► Fatigue cracks are modeled by means of cohesive elements. ► Fatigue crack growth and the outcome of inspections are affected by uncertainties. ► The optimal maintenance scheme is determined using reliability based optimization. ► The optimum is a trade off between the inspection, repair and failure costs.
Related Topics
Physical Sciences and Engineering Computer Science Computer Science Applications
Authors
, , , ,