Abstract
This paper presents a methodology for the minimization of the energy penalty in oxy-fuel power plants that also includes ASU and CPU optimized designs with lower energy consumption, a boiler working with a high oxygen concentration (up to 40%v) in oxidant and waste energy integrated with a new designed steam cycle. Results show an important increase in power plant net efficiency (36.42%, LHV basis) regarding oxy-fuel reference power plant (32.91%). As a consequence, energy penalty can be reduced from original 10.5 points to 7.3 points.