Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
7406344 | Energy Policy | 2012 | 19 Pages |
Abstract
âºWe case-studied cogeneration plants for a residential complex in Korea. âºWe estimated the annual 8760-hourly demands for electricity, heating, and cooling. ⺠We simulated the operation of CHP and estimated the fuel and electricity costs. ⺠We found payback periods that were shorter than two years for well-planned systems. ⺠A progressive electricity tariff plays a key role in the economic merits.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
Mo Chung, Chuhwan Park, Sukgyu Lee, Hwa-Choon Park, Yong-Hoon Im, Youngho Chang,