Article ID Journal Published Year Pages File Type
7539425 Transportation Research Part B: Methodological 2016 14 Pages PDF
Abstract
The paper uses the LP method to obtain the macroscopic fundamental diagrams arising under four different traffic coordination schemes for streets with four different block length configurations. It is found that the best scheme depends on the prevailing density. Curiously, the popular scheme in which all the traffic green phases are started synchronously wins only in rare circumstances. Its performance is particularly underwhelming when the street's blocks are long. The paper also presents density-aware numerical methods to optimize the signal offsets for 1-way and 2-way streets. For 1-way streets operated with a common cycle the method reduces to a simple graphical construction . In this case the resulting flow matches the flow that would arise if all of the street's intersections except one with the shortest green phase had been eliminated.
Related Topics
Social Sciences and Humanities Decision Sciences Management Science and Operations Research
Authors
, ,