Article ID Journal Published Year Pages File Type
8126376 Journal of Petroleum Science and Engineering 2015 12 Pages PDF
Abstract
This modified approach is used to estimate average-reservoir pressure that uses flowing pressures and production rates during BDF, allowing the classical material balance calculations to be performed. These calculations, in turn help determine the reserves, recovery factor, and reservoir drive mechanisms, allowing the reservoir performance and management to be properly evaluated. Furthermore, this method can be used to calculate both connected oil volume and reservoir drainage area as a function of time. Finally, this approach provides a reasonable estimation of the reservoir's shape factor.
Related Topics
Physical Sciences and Engineering Earth and Planetary Sciences Economic Geology
Authors
, , ,