| Article ID | Journal | Published Year | Pages | File Type |
|---|---|---|---|---|
| 9663610 | European Journal of Operational Research | 2005 | 20 Pages |
Abstract
This paper is concerned with a double-track train scheduling problem for planning applications with multiple objectives. Focusing on a high-speed passenger rail line in an existing network, the problem is to minimize both (1) the expected waiting times for high-speed trains and (2) the total travel times of high-speed and medium-speed trains. By applying two practical priority rules, the problem with the second criterion is decomposed and formulated as a series of multi-mode resource constrained project scheduling problems in order to explicitly model acceleration and deceleration times. A branch-and-bound algorithm with effective dominance rules is developed to generate Pareto solutions for the bicriteria scheduling problem, and a beam search algorithm with utility evaluation rules is used to construct a representative set of non-dominated solutions. A case study based on Beijing-Shanghai high-speed railroad in China illustrates the methodology and compares the performance of the proposed algorithms.
Related Topics
Physical Sciences and Engineering
Computer Science
Computer Science (General)
Authors
Xuesong Zhou, Ming Zhong,
