| Article ID | Journal | Published Year | Pages | File Type |
|---|---|---|---|---|
| 9663866 | European Journal of Operational Research | 2005 | 18 Pages |
Abstract
We study the impact of positive lead times on the multi-level lot-sizing problem in a rolling schedule environment. We show how stockout situations may arise even in a context of deterministic demand. We therefore develop a procedure to avoid such stockouts and we compare its performance through a simulation study to a safety stock strategy. Simulation results show the superiority of the proposed procedure.
Related Topics
Physical Sciences and Engineering
Computer Science
Computer Science (General)
Authors
N. Dellaert, J. Jeunet,
