Article ID Journal Published Year Pages File Type
993061 Energy Policy 2011 9 Pages PDF
Abstract

This paper presents a case study of the electrification of a riparian community in the State of Pará, Brazil, within the scope of the Program for Electric Power Service Universalization in Brazil. The community is located in a remote area; approximately 100 km from the municipal district, there is no regular transport to access the community, and adequate communication service. The community is provided with electrification facilities through a small biomass-based power plant, directly firing residues produced by the local economic activity. The objective of the paper is to propose a sustainable management model that is suitable for community's isolation conditions, considering the high costs with operation and maintenance related to the supply of isolated consumers in small locations. A simulation is conducted for the operation of the small biomass-based power plant, the generation costs are determined, the legal aspects are analyzed, and a suggestion for the management model is presented.

► Electrification of isolated consumers is a great challenge for utilities. ► Using local labor and resources allows lower energy costs for electrification. ► Creation of a specific legislation for utilities is required. ► Should also be implemented social activities together with electrification.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , , ,