Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
10327201 | Robotics and Computer-Integrated Manufacturing | 2005 | 9 Pages |
Abstract
This paper investigates a scheduling model for optimal production sequencing in a flexible assembly system. The system features a set of machines working together in the same workspace, with each machine performing a subset of operations. Three constraints are considered: (1) the precedence relation among the operations specified by the assembly tree; (2) working space that limits concurrent operations; and (3) the variation of process time. The objective is to find both a feasible assignment of operations to machines and schedule tasks in order to minimize the completion time for a single product or a batch of products. The assembly process is modeled using timed Petri nets and task scheduling is solved with a dynamic programming algorithm. The method calculates the time required precisely. A detailed case study is discussed to show the effectiveness of the model and algorithm.
Related Topics
Physical Sciences and Engineering
Computer Science
Artificial Intelligence
Authors
Weijun Zhang, Theodor Freiheit, Huashu Yang,