Article ID Journal Published Year Pages File Type
414560 Robotics and Computer-Integrated Manufacturing 2010 6 Pages PDF
Abstract

The scheduling problem of robotic material handlers in flexible manufacturing systems (FMSs) is NP-hard. This paper proposes a state-dependent algorithm for the FMS robot scheduling problem in make-to-order (MTO) environments for mass customization (MC). A mathematical model of the problem is formulated. A computational study of the proposed algorithm is performed. The algorithm is compared to an effective FMS robot scheduling rule, the shortest remaining processing time first (SRPF) rule. The results reveal the effectiveness of the algorithm in increasing the productivity-based measures of the FMS. Practical application insights are discussed. Further research is also provided.

Related Topics
Physical Sciences and Engineering Computer Science Artificial Intelligence
Authors
, , ,