Article ID Journal Published Year Pages File Type
475088 Computers & Operations Research 2015 11 Pages PDF
Abstract

We consider the problem of scheduling a set of jobs on a set of identical parallel machines where the objective is to minimize the total weighted earliness and tardiness penalties with respect to a common due date. We propose a hybrid heuristic algorithm for constructing good solutions, combining priority rules for assigning jobs to machines and a local search with exact procedures for solving the one-machine subproblems. These solutions are then used in two metaheuristic frameworks, Path Relinking and Scatter Search, to obtain high quality solutions for the problem.The algorithms are tested on a large number of test instances to assess the efficiency of the proposed strategies.The results show that our algorithms consistently outperform the best reported results for this problem.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , ,