Article ID Journal Published Year Pages File Type
475089 Computers & Operations Research 2015 9 Pages PDF
Abstract

We consider a problem arising in the context of industrial production planning, namely the multi-product discrete lot-sizing and scheduling problem with sequence-dependent changeover costs. We aim at developing an exact solution approach based on a Cut & Branch procedure for this combinatorial optimization problem. To achieve this, we propose a new family of multi-product valid inequalities which corresponds to taking into account the conflicts between different products simultaneously requiring production on the resource. We then present both an exact and a heuristic separation algorithm which form the basis of a cutting-plane generation algorithm. We finally discuss computational results which confirm the practical usefulness of the proposed inequalities at strengthening the MILP formulation and at reducing the overall computation time.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, ,